brainstorming
brainstorming
You MUST use this before any creative work - creating features, building components, adding functionality, modifying behavior, or planning anything new, in software or out of it (a talk, a business, a renovation).
icassp-workflowUse when planning an ICASSP project timeline — the annual clock from venue fit through the September paper deadline, single-blind review, the short winter rebuttal, spring notification, IEEE Xplore camera-ready, and the May conference — with backward-planning offsets and the choice among standard, OJSP-ICASSP, and grand-challenge tracks.
Independent GitHub snapshot · Automated classification · Original documentation governs
Use this as the project-management skill for an ICASSP submission. Replace every date with the current official timetable and work backward from the paper deadline. ICASSP is an IEEE Signal Processing Society conference, rebuilt by a new local committee each year; it has no standing editor-in-chief, and the cost model is registration, with the proceedings paper published in IEEE Xplore.
icassp-topic-selection).| Weeks out (heuristic) | Milestone |
|---|---|
| 8+ | Mechanism frozen; standard corpus and scorer chosen |
| 6 | Baseline reproduced on the same corpus/split/scorer |
| 4 | Condition sweep and ablation complete, seeds logged |
| 3 | Full draft sitting in the IEEE 4+1 two-column template |
| 2 | Internal mock review by a subfield-fluent colleague |
| 1 | PDF eXpress pass, author-block/ethics check, figure legibility |
| 0 | Upload via CMS; download and re-read the stored PDF |
These offsets are planning heuristics — anchor each to the current official timetable, never to a past cycle.
Standard 4+1 -> TPC review, IEEE Xplore proceedings, in-person present
OJSP-ICASSP 8+1 -> OJSP editorial review, open-access journal, present (not in proceedings),
earlier pre-registration deadline
SPS-journal present -> already-accepted SPS-journal paper, not re-reviewed, not in proceedings
Grand Challenge -> short paper via the challenge, present, may appear in proceedings
[Current stage] idea / experiments / writing / submission / rebuttal / accepted / camera-ready
[Next official deadline] <date and source, or unknown>
[Track] standard / OJSP-ICASSP / journal-present / grand-challenge
[Critical path] <three tasks that determine readiness>
[Owner map] <task -> person or role>
The 2026-cycle dates and the ICASSP 2027 September gate were checked 2026-07-09 (see
../../resources/official-source-map.md); the 2027 exact deadline is 待核实 until its CFP is
readable directly. Nothing carries from Barcelona to Toronto automatically — re-open the current
call.